EAS is currently completing the structural design for the Athletic Field and ADA Upgrades Project at Hollywood High School. Our scope of work includes: Three (3) access / pedestrian bridges that include steel frames and spread or caisson foundations; Four (4) wheelchair lifts with spread or caisson foundations depending on the type of lift; Score board steel frames with caisson foundation design; Football goal posts; ticket booths, and 40’ outfield baseball poles with netting.