Niklor Chemical




EAS performed seismic analyses, strengthening and foundation design for an Evaporator Tower, Bleach Tanks and Waste Water Tanks. The Evaporator Tower was placed on drilled pier concrete foundations, the tanks were placed on concrete mat foundations.